Reliable Monobloc Hot Tea Drink Filling Machine
Characters
1. The tea drink filling machine are used for green tea, black tea, oolong tea, juice hot filling and sealing
2. The tea drink filling machine integrates washing,bottling and capping together. The design is scientific and reasonable. Its appearance is beautiful. Its operation and maintenance is convenient.
3. The automation is high. It is good equipment for choose tea process machine .
4. The tea drink filling machine adopts block bottle-neck hanging work state design and bottling valve rise-drop design. It can meet the requirements of hot bottling of below 95 degrees Celsius.
5. The tea drink filling machine adopts hanging type conveying-bottle structure to make changing bottle model more convenient,faster and easier.
6. The main machine adopts advanced PLC control technology. The key electric elements adopt international famous products.
Reliable Monobloc Hot Tea Drink Filling Machine
Parameter
Model | Washing heads | Filling heads | Capping heads | Capacity (500ml) | Motor power | Overall dimension(mm) |
CGFR8-8-3 | 8 | 8 | 3 | 2000BPH | 3KW | 1900*1420*2000 |
CGFR12-12-6 | 12 | 12 | 6 | 4000BPH | 3.5KW | 2200*1600*2300 |
CGFR18-18-6 | 18 | 18 | 6 | 7000-8000BPH | 4KW | 2450*1900*2300 |
CGFR24-24-8 | 24 | 24 | 8 | 10000-12000BPH | 4.8KW | 2750*2180*2300 |
CGFR32-32-10 | 32 | 32 | 10 | 12000-15000BPH | 7.6KW | 4000*2300*2300 |
Reliable Monobloc Hot Tea Drink Filling Machine
Reliable Service
We have 1 year warranty and lifetime maintenance.
Within one year, if there is some accessory going wrong, we will send you the accessory at once, free of charge.
1) Within one month, if the machine is of any big fails, we will send you a new machine.
2) Within one year, if you send back the equipment for repair, we will be responsible for the repair, including the changes of accessories; Both of them are free of charge.
3) After one years, we offer to repair the machine, but we quire for the cost of the changed parts, not for manual cost.
4) No responsibility for man-made destroy.
5) If the buyer has any questions from our technical department, we can supply on-line service or we can send professional engineers to help you debug them.
Reliable Monobloc Hot Tea Drink Filling Machine
Payment and Terms
1. Payment Method:
1. 30% by T/T as down payment within 7 days the contract signed
70% by T/T paid before delivery
2. Mechanical Warranty:
One year warranty and come with at least one year recommended spare parts
3. Delivery & Packing:
Ø Delivery Time: 40~45 days after get down payment & bottle/label samples
Ø Coming Document:
1) Machine Quality Guarantee
2) Complete set install & maintain instruction Book in English language
3) Complete Document for customer to clear its custom
Ø Packaging requirement:
1) The special packaging box is according to the immunity standard in China,it suits for long-distance transport, damp proof, rustproof, land way and seaway
2) Transportation ways: Sea transportation